tel (425) 449 2028 info@nibio.net
January 30th 2014

January 30th 2014

The mudroom is coming to a completion. Everything is painted, hooks are hung. Winter tires have a spot, lawn mower is on a special tarp. One more weekend of organizing the back storage room and we are done. ~front view~ ~side view with back storage room~ ~details~...
January 27th 2014

January 27th 2014

Had an amazing video shoot today.  Video’s will be uploaded soon! Please check out my mini website for a great offer. http://kirklandorganizeitpro.com/ ~setting up the studio~ ~going over the script~...
January 20th 2014

January 20th 2014

A lot of progress over the weekend. Framing is done, bead boards are up. First coat of white paint, left garage wall is painted, bench is stained. Found black leather baskets for more contrast. ~installing bead boards~ ~bead boards done~ ~framing done~ ~first coats of...
January 15th 2014

January 15th 2014

Lovely transformation of this Teenager’s Bathroom. We got rid of old sinks, beige tiles and carpet. With the design of the black-grey border I made sure the 2 rooms would come together visually. With the same floor tiles everywhere the 3 bathroom areas feels as one bathroom spa.       ~before~...
January 13th 2014

January 13th 2014

We have worked very hard on the weekend, side wall is up. Bench and cubby are mounted to the wall. Bead board is next, painting of the seat and way more. ~side wall~ ~bench installed~ ~bench and cubby...